INTRODUCTION:
The potential value of railway to New Zealand was recognised from the early days of the British Colony. Many of the new immigrants had come from Britain and Europe where the development of railway had been heralded as the vanguard of the industrial age. By 1840 Britain had 2857 kilometres (1775 miles) of track. In other places, such as the United States of America, the railway had opened the way for greater settlement of the fertile hinterland. For New Zealand with its awkward terrain, the development of a railway network was seen as a way of transporting produce from countryside to the ports and overcoming the vast distances between the newly established towns.
The first public railway was from Christchurch to the river port of Ferrymead and opened in 1863. This was soon surpassed by the building of the Christchurch to Lyttelton line, requiring the construction of the Lyttelton tunnel, which at the time of its completion in 1867 was one of the longest railway tunnels in the world. Other small provincial or private railway lines were either constructed (e.g. Invercargill to Bluff, opened 1867), or begun but failed due to the sheer cost of construction (e.g. the Waitemata Harbour to Drury, commenced 1863). The financial burden of constructing a railway proved too much for many of the Provincial Governments. The solution lay in Central Government. In 1870 Colonial Treasurer, Julius Vogel announced the ambitious scheme of a national network of light rail funded by £10 million loans to be raised over the following decade. To provide the manpower he also proposed a large-scale immigration scheme.
WELLINGTON'S EARLY RAILWAYS:
Up until the announcement of Vogel's scheme no railway had been built in Wellington. In 1872 work began on the Wellington to Lower Hutt section, with the first sod turned at Pipitea Point - at that time the only land available suitable for a station and yard. Progress was slow and it wasn't until 1876 that the line reached Upper Hutt. In 1878 the Pipitea Station burnt to the ground and in response to pressure from the public a new station was built closer to town on land recently reclaimed at the rear of Government Buildings. It opened on 1 November 1880.
Across the country the railway continued to expand. Initially the Public Works Department had managed the construction but, by 1878, two rail commissioners were overseeing the works. In 1880 a separate Railways Department was formed within Public Works. By this time there was over 1200 miles [1900 kilometres] of working railway (mostly in the South Island) carrying over 830,000 tons of freight as well as livestock and passengers. Wellington's railway system boasted two lines. The eastern line went to the Hutt Valley and would eventually extend on to the Wairarapa and Hawke's Bay, while the western line would reach Johnsonville in 1885.
These achievements were somewhat curtailed as New Zealand plunged into an economic depression that would last until the early 1890s. In 1880 a Railways Commission criticised those who in the previous decade had pushed ahead with the construction of the railway at a rate that could not be sustained. As a result the construction of many lines was halted, including the western line out of Wellington. The halting of the latter was not popular with a group of Wellington businessman, farmers and newspapers. Eventually it was agreed that all work on the western line would be handed over to a private company who would continue its construction. The North Island West Coast Railway Co. (later the Wellington and Manawatu Railway Co. or WMR) was formed and, following the passing of legislation, was allowed to reclaim land in Thorndon for the construction of the company's station and yard. The new station became known as the Manawatu Station. The private line reached Otaki on 1 December 1886.
Meanwhile the building of Wellington's Railway Wharf in 1880, which linked shipping directly with the railway, resulted in the separation by rail of the wharves and commercial district. In addition, traffic had increased and it was decided to open Bunny Street through to Waterloo Quay, which would have meant crossing the railway line. To avoid this the government railway station was shifted on rollers to a new site at the intersection of Lambton and Thorndon Quay. Originally known as Government Station, following the public purchase of the WMR this station would eventually become known as Lambton Station. A third station and line south was built by the Government at Te Aro in 1893. This line was closed in 1917.
During the 1880s and 1890s construction of the national rail network did continue albeit at a slower rate, and it was not until November 1908 that the last spike for the North Island Main Trunk Line was driven at Manganuioteao (Last Spike Memorial, Register No.7575). With the imminent completion of the North Island Main Trunk line, in 1907 the government gave notice to the WMR that it was going to invoke its right to compulsory purchase, and in 1908 the line became part of the government rail network. Although it had always been intended that the formerly private Thorndon Station (previously known as the Manawatu Station) and the Lambton Station would be combined, this never happened. This meant that until the building of the new station building in 1937 Wellington had two terminals for trains travelling north, one for the western line and one for the eastern line.
A NEW YARD AND STATION:
In the early decades of the twentieth century, increasing pressure from the public for a single terminal prompted plans for a major remodelling of Wellington's railway facilities. For the development to happen more land was required. In 1922 the Wellington Harbour Board and the Railways Department came to an agreement to reclaim about 28 hectares [68 acres] from the harbour. This was to be the largest single reclamation of land in the port's history. The work began in 1923 and was completed in 1932. The newly reclaimed land allowed for the construction of a new double track railway and the provision of extensive train marshalling, goods yards and sheds. In the following year work began on the new railway station.
The commission for designing the new station had been awarded to the noted architectural firm of Gray Young, Morton and Young, which had formed in 1923 and was composed of William Gray Young (1885-1962), Hubert Morton and Gray Young's brother Jack. The firm had recently finished large commissions for Victoria University, designing Stout (1930) and Weir House (1930) and would design Kirk Building (1938) before the end of the decade. Initially William Gray Young's design included a much larger Featherston Street wing, housing a mailroom, but this was removed from the final blueprint to cut building costs.
In 1933, the Depression had reduced construction costs sufficiently that the Government was able to begin work. The Fletcher Construction Company was contracted to build the station for £339,137. Work on the new station commenced in July 1933 and was constructed on land reclaimed in 1876 by the Wellington Provincial Government, close to the new rail yards, the wharf and the city. By October 1934, a sufficient number of piles had been driven to begin main construction of the superstructure and less than two months later, on 17 December 1934, large crowds gathered to watch the Duke of Gloucester lay the foundation stone amidst much pomp and ceremony.
During the construction economic conditions began to improve. This allowed for several variations in the plan to be made. These variations included four storeys to the Featherston Street wing and another floor added to the northern wing, or the addition of the 6th-floor penthouse on the southern part of the building.
The new Wellington Railway Station was officially opened on 19 June 1937 by his Excellency, the Governor General, Viscount Galway. According to newspaper accounts of the time, the Station's design was intended to reflect the importance of the railways in the nation's progress and development. Enclosing the platforms on three sides, the U-shaped building was built of steel and concrete with an outer coating of steel reinforced brick on the street facades, and was especially designed using the latest technology to resist earthquakes. The outer cladding on the street facades consisted of bricks designed with slots to accommodate vertical steel rods. Over 1.75 million bricks and 1500 tonnes of granite and marble were used in the construction of the station. At the time of it opening it was the largest building in New Zealand, covering 0.6 hectares, and with a combined floor area of two hectares.
Outside, spacious lawns and paths of paving stones with brick edging were arranged in a herringbone pattern to create a park in front of the station. The somewhat imposing station entrance, made up of a colonnade of eight, 13 metre [42 foot], Doric columns opened into a large booking hall decorated with delicately mottled dados that extended to a high, vaulted ceiling. From the booking hall was the entrance to the concourse where concrete arches and a glazed roof were designed to give it the appearance of a 'vast sunroom'. Beyond the concourse were the newly constructed fully canopied platforms that initially accommodated up to 12 carriages
Much thought was given to the public facilities. The large concourse contained waiting rooms and restrooms, a large dining room, a barbershop, book and fruit stalls and a first aid room. The idea was that the railway station would have all the facilities of a 'first-class' modern hotel for railway travellers, but without the accommodation. Inspired by a similar provision in the Flinders Street Station in Melbourne, the architects also incorporated a well-equipped, spacious nursery on the top floor to allow parents to leave their children while they shopped or waited for their train. This was the first such facility to be provided at a New Zealand station.
Five of the six floors were used as office space by the Railway Department staff who had previously been accommodated in 11 leased buildings. The new Railway Station also provided a social hall for its staff. This was not uncommon for the Railways Department, which saw the value of providing facilities where employees could meet and socialise. The social hall was located apart from the main station building at the north end of the eastern wing of the station. Most of the ground floor of this building was operated as a garage for vehicles belonging to the Railways head office, and included rooms for the General Manager's chauffeur. The access to the social hall was from a separate entrance on Waterloo Quay. On the ground floor was a meeting room and cloakrooms. On the first floor were more social areas, including a large hall with a small stage. In years to come this building would be used for staff functions including Christmas parties, dances and retirement celebrations. It was also used by clubs - such as railway sporting teams and hobby groups, as well as a venue for staff to hire for weddings, birthday parties etc. In a more formal capacity it was used for such things as conferences, inquiries and union meetings.
Late in 1938 work commenced on extending the Featherston Street wing to accommodate increasing staff numbers. This work included the construction of another two levels and a single storey wing further along Featherston Street. It is most likely that these changes were completed in 1939. The land on which the single storey wing was constructed was once the location of the Lambton Station. However it is not known whether the Lambton Station was specifically demolished at this time to make way for the new extension or it had been removed following the opening of the station in 1937.
At the same time as the construction of the Featherston Street wings the main offices were reorganised - perhaps mostly notably was the movement of the General Manager's office from the third floor to the fourth floor where the east wing became a senior management suite. The area included a boardroom that has a ceiling with the profile of a railway carriage.
Also at about this time the area of lawns and paths in front of the station were transferred by statute from designated Railway land to the Wellington City Corporation for street purposes. However, the Railways Department retained the right to refuse any changes to the layout (including the building of structures) and maintenance of the area was to be shared between the two organisations.
During World War II the Railway Station experienced a dramatic increase in rail passengers and goods. The railway network was the main way troops were moved around the country. One notable event to occur during these years was the funeral of Prime Minister Michael Savage. Following a requiem mass at the Sacred Heart Cathedral, Thorndon (Register No.214), Savage's body was transported to the Wellington Railway Station where thousands of people gathered to farewell him. A special train then carried his coffin to Auckland where to be buried on Bastion Point.
The 1950s were the zenith of New Zealand railways. During these years the government department employed 24,686 employees and utilised over 5689 kilometres of track - the greatest extent of the railway. As well as providing a rail service, over the next two decades the Railways Department also expanded its feeder services such as passenger bus services, road transport, airfreight, and ferry operations. At Wellington Railway Station extra platform space was provided when what is now known today as platform 2 was extended and allowed for the installation of platform 1. A new canopy was constructed to extend the coverage of the original platform 2 canopy and service both platforms. With increased business, accommodation within the Railway Station became an issue, forcing some staff to move to other premises. By the 1960s it was estimated that over 42,000 people used the station each day, nearly triple the number that used the station in 1937. Throughout the following two decades plans were drawn up to improve the office accommodation, but nothing came of it.
PRIVATISATION:
It is suggested that by the 1980s, the competition from road and air transport meant that the railways were no longer making a profit. In 1982 the New Zealand Railways Corporation replaced the Railways Department. It was hoped that the newly created organisation, based on a more commercial model, would lift railway revenue. Over the next few years staff numbers were reduced by a quarter. At Wellington Railway Station the reduction in staff numbers resulted in office space becoming available for lease.
In 1988 commercial activity such as the bookstall and cafeteria, which had been run by railways staff since the construction of the station, were closed with the intention of leasing the spaces to private retailers/businesses. In 1989, the ground floor of the station was rearranged. The barber's shop and men's toilets were converted into 'Trax Bar and Café' and the ladies' waiting rooms were converted into toilet blocks. The original dining hall and kitchen were converted to provide more office space. At about this time platforms 2-7 were shortened at the building's (south) end to increase circulation space. The large concrete planter boxes were installed at the same time.
In 1990 as part of the Sesquicentennial celebrations the Institution of Professional Engineers New Zealand (IPENZ) officially recognised the importance of the Wellington Railway Station in New Zealand's engineering history with the erection of a plaque in the Booking Hall. The plaque reads:
'IPENZ recognises this building as an important part of N.Z.'s Engineering Heritage. Once N.Z.'s largest public building, it was also the first major structure incorporating a significant measure of resistance to earthquakes'.
In more recent years it has been included in Wellington City Council heritage trails as a place to visit.
In 1991 there was a major restructuring of New Zealand Railways. The Railways Corporation retained ownership of the land and buildings. A new organisation known as New Zealand Rail Ltd. took over rail operations including freight distribution, commuter and long-distance passenger services, as well as the Interisland Ferry. Both organisations retained offices in the Wellington Railway Station Building. In 1993, New Zealand Rail was sold to a business consortium, and was renamed Tranz Rail in 1995.
During the 1990s the Westpac Trust Stadium was constructed on surplus railway land to the north of the platforms (completed November 1999). As part of the development, access to the stadium elevated walkway was provided via ramps from the station platforms 3-8. This required the canopies of platforms 7-8 to be shortened to the same length as platforms 3-6, and the canopy on platform 9 was also shortened. The fibrolite canopy roofs for platforms 3-9 were replaced at this time with steel, with concrete supports constructed around the base of the original canopy supports, renewing the foundations. A pedestrian bridge was constructed from Thorndon Quay over the top of the platforms to connect with the main stadium concourse. The construction of the stadium has led to an increase in demand for the suburban railway network, as the trains carry thousands of people to and from the stadium to attend sporting events, concerts and 'expos'.
In 2000 Tranz Rail moved to its head office (corporate management) to Auckland, but retained use of some of the main station building for running the local suburban network. Operational management of the whole national railway network also remained in Wellington. Three years later the western side of the building was leased to Victoria University as part of its city campus. Major refurbishment, designed by Athfield Architects and carried out primarily by Fletcher Construction, has been undertaken to provide suitable accommodation for the university. These changes (beginning in August 2003) have included the construction of six concrete shear walls in the east and west wings and the centre part of the building, requiring the demolition of existing walls and finishes and rerouting services away from the shear walls. Extensive saw-cutting into walls and columns was also required to make way for the massive structures. A dedicated access to the university wing from the concourse was constructed requiring the installation of three new lifts and associated shafts. The internal walls of the area occupied by the university have been reorganised with provision of large spaces for student study and gathering areas. In addition the 24-hour-a-day train control centre was relocated from the western wing to the eastern side of the southern part of the building. Floors 1-4 have been completed. This work is ongoing and at the time of writing this report (January 2008) the 5th floor of the western wing was in the process of being converted for university occupation.
One other major change to the Wellington Railway Station was the construction of the Railway Metro New World supermarket. This was completed in December 2006 and was intended to cater to commuters, nearby apartment dwellers and workers in the station area. The supermarket is located partly in the booking hall (and adjacent vacant space) and partly in the concourse. In 2007 the last remaining kiosk was removed from the concourse (it is not known when the other was removed).
With regard to the occupancy of the building, in 2004 Tranz Rail was sold to the Australian-based Toll Holdings. In a subsequent deal the New Zealand Government repurchased the rail network, and in return Toll was allowed principal commercial use of that network. The ownership and management of the rail network were vested in the New Zealand Railway Corporation (now known as Ontrack). Thus management of the national rail network has continually been run from the Wellington Railway Station.