Between the 1865 and 1880s, a number of bluestone bridges and culverts were constructed on the Timaru downlands, between Washdyke Creek and the Pareora River. They were mainly built over ephemeral streams which flow only in wetter periods, and in some cases replaced earlier timber bridges. At a monthly meeting of the Levels Road Board in May 1874, a petition was read from Mr Guscott and others asking the Board to build a bridge rather than a ford over the creek between Briggs’ and Guscott’s places. In May 1874 the Levels Road Board recorded that ‘the Engineer call for tenders for a stone bridge over creek on the road leading to Mr Guscott’s’. A notice in the Timaru Herald on 14 July 1875 called for tenders for a stone bridge over Pighunting Creek at Mr Guscotts. Elsewhere on that same edition of the Timaru Herald, it was reported that the tender of Jones, Peters and Hope for a stone bridge, Guscott’s Road, for £274 6s was accepted.
The Stone Bridge is on a relatively straight stretch of Guscott Road, around 200 metres to the north-west of the two storeyed stone Guscott House (Former) (List No. 2002), 161 Guscott Road, Otipua. The Stone Bridge has a span of approximately eight metres. The road width is 5.1 metres and the depth of the crown of the arch to creek is approximately 2.8 metres. The materials are squared bluestone brought to course. In his 1958 publication, South Canterbury – A Record of Settlement, Oliver A Gillespie records the construction of these early bridges as follows: ‘Before building a stone bridge, a wooden framework was erected to support the weight as the prepared stones were placed in position. Cement was used only for foundations and to smooth over interstices between the stones after these had been filled with chips. Stones, shaped at an angle to give an arch, were packed as tightly as possible. Those last to be placed in position were the wedge-shaped keystones which locked the whole structure and gave it strength. Once they were placed, the framework was removed and the bridge was ready to take the weight of traffic.’
In 1986 the bridge was repointed and parts repaired with a concrete skin.